Projects5 min
Guanacaste: palapa in high solar and salt exposure
Harsh sun, salt spray and hurricane season are three simultaneous loads on the same roof. Here is what changes — and what does not — when the project sits on the coast.

Sun is the load most often underestimated
On the north Pacific coast, radiation is the first variable to degrade a roof. The panel is tested under ASTM G155 to 6,000 hours of UV exposure, roughly 12 years of harsh sun, and the 20-year warranty expressly covers sudden colour loss. That is the figure worth taking into the client conversation, because visual deterioration shows long before any functional failure.
Salt: the material is not the problem, the fasteners are
The panel is an engineered polymer: it does not rot, does not grow mold and offers no organic material for salt spray to attack. Where specification does need care is the supporting structure and the fasteners, the exposed metal parts of the system. That detail is resolved as on any coastal build and is independent of the roof covering.
Wind and season
The system is certified for 160 mph winds. That certification assumes the full fastening pattern — 7 nails per panel — and the 18° minimum slope: coastal work is the last place to relax the nailing detail to save time.
Phasing and colour matching
Coastal projects are usually built in phases. Declare it from the first quote: we coordinate custom colour matching across production lots and hold regional stock, so phase three does not arrive in a different tone from phase one.
Where we have installed
We work across Costa Rica, with completed work in Guanacaste, Puntarenas and the Central Valley: club house pool decks, residential tower amenities, condominium social areas and private ranchos. If your project faces the ocean, message us with the location and stage and we return the construction detail that applies.
Keep reading
View all posts
Specification6 min
How to calculate synthetic thatch area from your roof plan
Exposure, overlap, minimum slope and waste: the formula that avoids over-ordering.

Codes5 min
ASTM E108 Class A: what it means for your Costa Rica project
How to present fire testing to the client, the municipality and the insurer.

Cost7 min
Total installed cost: synthetic vs. natural palm over 10 years
Re-thatching, fumigation and operational closures that never make the first budget.
